Viewing page 4 of 6 pages.
Previous 1 2 3 4 5 6 Next
TESTING
System Configuration:

Test platform device listing.
|
Measurement and Analysis Tools
Our testing procedure is a simple one involving placing the test system in various states until temperatures remain stable for 5~10 minutes. The test states are idle, playing H.264 video, encoding video with TMPGEnc, full CPU load using Prime95 (small FFT setting), and full GPU loading using FurMark, an OpenGL benchmarking and stability testing utility.
Temperatures were recording using various software tools and an infrared thermometer on the hottest point of the exterior as well as the AC power draw from the wall.
| Help support this site, buy from one of our affiliate retailers! |
|